For maintenance teams on the A320neo family, a hot engine means time on the ground. Borescope inspections and other hot section work cannot start until the core has cooled.

On 1 November 2026, Airbus published an Aircraft Maintenance Manual (AMM) revision that includes FCS Finland’s AFC-22 and AFC-23 Hybrid engine cooling systems for LEAP-1A engines. Operators of LEAP-1A powered A320neo family aircraft can now use FCS cooling within their standard Airbus maintenance documentation.

In our launch data, AFC brought an engine down to the ≤60°C needed for hot section maintenance in 45 minutes, compared with four to nine hours using normal cooling methods.

The revision follows the LEAP-1A approval FCS received in June 2026. It also adds to our existing manual inclusions, which include the Boeing 787 (GEnx-1B), 777 (GE90) and 737 (LEAP-1B) AMMs, as well as Pratt & Whitney’s PW1100, PW1900 and PW1500 engine manuals.

For LEAP-1A operators, faster cooling is now part of the manual.

To find out more, contact sales@fcsfinland.fi.